What Happens During Bifold Door Installation? Step by Step

Short answer

Bifold installation starts with a survey and accurate measurement of the finished opening, followed by manufacture, which takes several weeks. On fitting day the old doors are removed, the opening is checked, the threshold is fixed perfectly level and the frame is secured. Panels are then hung, adjusted and sealed, and trims fitted. Most three to five-panel sets are fitted in one to two days.

What Happens During Bifold Door Installation? Step by Step

Survey and measurement

Everything depends on the survey. The surveyor measures the opening at several points across the width and height, checks that it is square and level, looks at the lintel or beam above, and notes the floor levels inside and outside. They will discuss which way the panels fold, where the traffic door goes, the threshold type and how the doors will meet the floor and patio.

If structural work is planned, the final survey normally happens once the opening has been formed and the steel is in, so the doors are made to the real opening rather than a drawing. Bifolds tolerate very little error, and a frame made a few millimetres too large or small causes problems that are hard to fix later.

Lead times and preparation

Bifolds are made to order, so expect a lead time of several weeks after the final survey, longer for special colours, timber or very large sets. Use that time to prepare. If a level threshold is planned, the patio outside may need to be raised or a drainage channel installed. Inside, decide how the flooring will meet the new threshold and whether the floor finish goes in before or after the doors.

Before fitting day, clear the room near the doors and move furniture well away, because panels are large and heavy and need space to be carried in and laid down. Make sure there is a clear route from the van to the opening, and arrange parking if access is tight.

  • Clear at least a couple of metres inside the opening.
  • Plan patio levels and drainage for a level threshold.
  • Decide on the floor finish at the threshold.
  • Arrange parking and a clear carrying route.

Removing the old doors and preparing the opening

On fitting day, the old doors and frame are removed, usually leaving the reveals exposed. The installer cleans out the opening, checks it again for square and level, and deals with any damaged plaster, brickwork or cavity closers. If the floor at the threshold is uneven, it is packed or levelled so the new threshold can sit perfectly flat, because a threshold that is out by even a small amount will make panels run downhill or bind.

Where there is a cavity wall, the cavity is closed and a damp-proof course is maintained around the opening, so moisture from the outer leaf does not track inside. This is also the point where any waterproofing under a low threshold is installed.

Fitting the frame, hanging and adjusting panels

The frame is assembled, set into the opening on the levelled threshold and fixed through the jambs and head into the structure, with packers at the fixing points so the frame is not distorted. The installer checks diagonals to confirm the frame is square. The panels are then hung on their hinges and carriers, the running gear is engaged in the tracks, and the glass is fitted if it was not glazed in the factory.

Adjustment is the skilled part. Each panel is adjusted for height and alignment so the whole set folds and closes smoothly, locks engage without force and the seals compress evenly. The installer then seals the frame outside, fits internal trims or finishes the reveals, and clears away packaging and old doors.

StageTypical timingWhat you will see
SurveyOne visitMeasurement, levels, options agreed
ManufactureSeveral weeksDoors made to measured size
Removal and preparationMorning of day oneOld doors out, opening cleaned and levelled
Frame and panelsDay one to day twoFrame fixed, panels hung and adjusted
Finishing and handoverEnd of fittingSealing, trims, demonstration and paperwork

Handover and checks

Before the installer leaves, ask them to demonstrate how to fold and unfold the set, operate the traffic door and lock every panel. Check for yourself that the panels move with light pressure, there are no gaps in the seals when closed and the locks engage fully. Look along the frame for scratches or damage and point out anything straight away.

Ask for the paperwork. In England this includes confirmation from a competent person scheme such as FENSA or CERTASS that the installation has been registered, along with product guarantees and care instructions. Keep these documents safe for when you sell the house.

Looking after bifold doors

Bifolds last longer when the tracks are kept clean. Grit and leaves in the bottom track wear rollers and make doors stiff, so vacuum and wipe the track regularly. Lubricate hinges, rollers and locks as the manufacturer recommends, and wash the frames with mild soapy water rather than abrasive cleaners.

If panels start to drop, rub or will not lock, call for adjustment early rather than forcing them. Small problems such as a slightly dropped panel are usually fixed with adjustment, from around £120, while forcing a misaligned door can damage hinges and locks and lead to more expensive repairs.

Questions people also ask

Can bifold doors be fitted in winter?

Yes. Installers fit bifolds all year round. The opening is only exposed for part of a day, and the old doors are normally removed in the morning with the new frame in by the afternoon. In very wet or windy weather, the installer may adjust the order of work or protect the opening temporarily.

Do I need to be home during bifold installation?

It helps to be there at the start to confirm the folding direction and threshold details, and at the end for the handover and demonstration. During the day the installers can usually work without you, as long as they have access, a clear work area and somewhere to put the old doors.

What if the opening is not level when the doors arrive?

Small variations are normal and are dealt with by packing and levelling the threshold before the frame goes in. If the opening is significantly out of square or level, the installer may need to carry out remedial work first. That is why an accurate survey after any building work is so important.

Written and checked by the Bifold Door Installation team. Read our editorial policy.

Get a free bifold door installation quote

Tell us what you need and we'll come back with a clear price.

Request a quote