Short answer
Replacement bifold doors in England are controlled fittings under Approved Document L and must meet minimum energy efficiency standards, which installers registered with a competent person scheme such as FENSA or CERTASS can self-certify. The glass must be safety glazing under Approved Document K. Forming or widening an opening is structural work that needs Building Regulations approval. Planning permission is not usually needed for replacements.
Energy efficiency: Approved Document L
In England, replacement external doors that are substantially glazed, which includes bifolds, are controlled fittings under Approved Document L of the Building Regulations. That means the new doors must meet minimum standards for heat loss, expressed as a U-value for the whole door set. Manufacturers publish U-values for their systems, and any reputable supplier will confirm that their product meets the current requirement.
The simplest way to show compliance is to use an installer registered with a competent person scheme, such as FENSA or CERTASS. They can self-certify the work and notify the local authority on your behalf, and you receive a certificate afterwards. If your installer is not registered, a Building Control application is needed before the work starts.
Safety glazing: Approved Document K
Approved Document K requires safety glazing in critical locations, where people are likely to walk into or fall against the glass. Glazed doors are a critical location, so all bifold door glass must be toughened or laminated to the appropriate standard. Each pane of compliant safety glass is normally marked in a corner with the standard it meets.
Laminated glass offers additional benefits. It stays in place when broken, which helps security, and some laminated glass reduces noise and fading from ultraviolet light. Toughened glass is more common and breaks into small blunt fragments. Both meet the safety requirement when correctly specified.
Structural openings
If you are forming a new opening in an external wall, or widening an existing one to take bifolds, the work is structural and needs Building Regulations approval. A structural engineer usually provides calculations for the new steel beam or lintel and the padstones that carry its ends. Building Control inspects the work, and you should receive a completion certificate at the end.
This structural work typically costs £2,000–£5,000 before the doors, including calculations, propping, steel, padstones and making good. On terraced and semi-detached houses, if the work affects a party wall, the Party Wall etc. Act 1996 may apply in England and Wales, and notice must be served on the neighbour.
| Work | Building Regulations | How it is approved |
|---|---|---|
| Like-for-like replacement doors | Yes, energy efficiency | Competent person scheme or Building Control |
| Safety glass in the doors | Yes, Approved Document K | Specified and marked glass |
| Widening or forming an opening | Yes, structural | Building Control with calculations |
| Doors in a new extension | Yes, as part of the extension | Building Control for the whole project |
Ventilation, escape and glazing area
Approved Document F expects that replacing doors or windows does not make a home's ventilation worse. If the old doors had trickle vents or the room relies on them, ventilation needs to be maintained, either through vents in the new frames or other background ventilation. Ask the installer how they will address this.
In extensions, large areas of glazing can affect whether the overall design meets energy and overheating requirements, so new extensions with big bifolds are assessed as a whole. If bifolds replace a window that served as an escape route from a room, the escape route needs to be maintained. These details are routinely handled by Building Control or the installer's scheme, but it is worth asking about them early.
- Maintain background ventilation if the old doors provided it.
- Large glazing in extensions is assessed with the whole design.
- Keep any required escape routes when replacing doors.
- Keep certificates and completion documents for when you sell.
Planning permission
Replacing existing doors with bifolds at the back of a house does not usually need planning permission, as long as the appearance is broadly similar. Forming a new opening in a rear wall is also often permitted development for houses in England. Planning becomes relevant for listed buildings, which need listed building consent for most changes to doors and windows, for properties in conservation areas with Article 4 directions, and for flats, which do not have householder permitted development rights.
If the bifolds are part of a new extension, the extension itself may need planning permission or fall under permitted development, depending on its size and location. Check the planning position before ordering, because made-to-measure bifolds cannot easily be changed once they are made.
Security standards
Security is not a Building Regulations requirement for replacement doors in existing homes in the same way, but Approved Document Q does require new dwellings to have doors and accessible windows that resist unauthorised entry. PAS 24 is a recognised UK security standard for doors and windows, and choosing a PAS 24 tested bifold system gives assurance on resistance to forced entry.
Many insurers also ask about door security. Multi-point locks on the traffic door and secure locking on every folding panel, with anti-lift features and good quality cylinders, make a significant difference. Ask your installer for the test evidence for the system they are supplying.
Questions people also ask
Do I need Building Regulations approval for replacement bifold doors?
Yes, in the sense that replacement glazed doors must comply with the energy efficiency requirements. Most people meet this by using an installer registered with a competent person scheme such as FENSA or CERTASS, who self-certifies and notifies the council. Otherwise, a Building Control application is required before work starts.
What certificate should I get after bifold doors are fitted?
If a competent person scheme installer fitted the doors, you should receive a certificate confirming the installation was registered. If structural work was done, you should also receive a completion certificate from Building Control. Keep both, as buyers' solicitors ask for them when you sell.
Do bifold doors need planning permission?
Usually not for replacement doors or a new rear opening on a house in England. Listed buildings, conservation areas with Article 4 directions and flats are exceptions. If the doors form part of a new extension, the planning position of the extension itself is what counts.
Written and checked by the Bifold Door Installation team. Read our editorial policy.
More guides
How Much Do Bifold Doors Cost in the UK? 2026 Fitted Prices
Three-panel uPVC bifold doors around 2.4 metres wide typically cost £2,500–£4,000 supplied and fitted in the UK in 2026, while aluminium bifolds of…
Aluminium vs uPVC vs Timber Bifold Doors: Which Should You Choose?
Aluminium bifolds offer the slimmest frames, largest panels and longest-lasting finish, at £3,800–£6,000 for three panels. uPVC bifolds are the most…
Bifold Doors vs Sliding Doors: Which Is Better for Your Home?
Bifold doors fold away to open almost the full width of the opening, which suits homes that want the inside and garden to feel connected in summer.…
What Happens During Bifold Door Installation? Step by Step
Bifold installation starts with a survey and accurate measurement of the finished opening, followed by manufacture, which takes several weeks. On…